Standard Operation Process
Document No. : Hawking FA disassembly SOP  Station:
Process Name :                  Ver. :     Date :
Fixture list(fixture specifications) Qty Fixture list(fixture specifications) Qty
Step:
Department:Tabulator:
Ya Zhu
IE
11(1/1)
1.00
Catch Hinge UP
1.Open machine with the angle then close , 
make hinge desperate with top.
2. Get TOP from upside
2018/03/12