Standard Operation Process
Document No. : Hawking FA disassembly SOP Station:
Process Name : Ver. : Date :
Fixture list(fixture specifications) Qty Fixture list(fixture specifications) Qty
Step:
Department:Tabulator:
Ya Zhu
IE
4(1/1)
Dismantle battery
1.00
2
5
4
3
1
1. Get BATT Screws
M2x3.5(6052A0051101))*4
❖ screwdriver head #1
❖ Torque :1.5 ± 0.30 Kg/cm
2. Remove and recycle the battery
Electric screwdriver
1
#1 screwdriver head
2018/03/12