Table 2·6. Technical TasksjPersonnel
Technical Task
Person Responsible
Line voltage measured
Electrician and HP CE
Power line frequency measured HP CE
Power line noise levels measured HP CE
Neutral to ground levels measured HP CE
Safety and ground connections verified
Electrician and HP CE
Advice on correct circuit breakers and wire sizes
Electrician and HP CE
Verification that maintenance power outlets (those used for Electrician
floor cleaning, etc.) are on separate circuits from the
computer system.
Recommendations about lightning protection
HP CE
Measurements and recommendations on radiated interference HP CE
Answers to questions concerning modems and modem
HP CE
options
Thermal load of HP equipment
HP CE
Thermal load of non-HP equipment
Customer/Vendor
Total air conditioning required
Customer /Contractor
2-6 Site Considerations