EasyManua.ls Logo

HP ProLiant DL360 G9 - Page 24

HP ProLiant DL360 G9
39 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Warning:
Eliminate the risk of electric shock by removing all AC power from the system before installing
or replacing any non hot-plug hardware option. Disconnect all power cords to completely
remove power from the server. Always follow Avaya's application procedures when shutting
down the server.
Warning:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
Procedure
1. Power down the server.
Follow Application power down procedures, if applicable.
2. Remove all power:
Disconnect each power cord from the power source.
Disconnect each power cord from the server.
3. Extend the server from the rack.
4. Remove the access panel.
5. If installed, remove the FBWC capacitor pack.
6. To remove the DVD drive, do the following:
a. Remove 3 Torx screws by using a T-10/T-15 Torx screwdriver as shown in the below
illustration.
b. Disconnect the SATA DVD cable from rear of DVD drive. Disconnect VGA/USB cables
from rear of system board to fully remove the DVD drive from the bay.
c. Remove the DVD drive from the server.
Maintaining and Troubleshooting the HP ProLiant DL360 G9 Server
November 2015 Maintaining and Troubleshooting the HP ProLiant DL360 G9 Server 24
Comments on this document? infodev@avaya.com

Other manuals for HP ProLiant DL360 G9

Related product manuals