EasyManua.ls Logo

HPE D3610

HPE D3610
43 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P1/P2
P1/P2
I/O-A
I/O-B
P1/P2
P1/P2
I/O-A
I/O-B
Figure 2: Disk enclosure to disk enclosure (single-domain)
Power cord guidelines
When connecting power cords, use the cords shipped with the disk enclosure. The power cord should be approved for use
in your country. The power cord must be rated for the product and for the voltage and current marked on the electrical
ratings label of the product. The voltage and current rating for the cord should be greater than the voltage and current
rating marked on the product. In addition, the diameter of the wire must be a minimum of 100 mm2 or 18 AWG, your
maximum length may be up to 366 m (12 ft).
After power is supplied to the disk enclosure, the power supply automatically senses the input voltage and the power
supply LED illuminates as solid green. To protect the system from power-failure-related downtime, each disk enclosure
ships standard with a redundant power supply. Depending how you connect the power supplies to the power source, you
can eliminate downtime caused by power-related failures.
Installing
19

Table of Contents

Other manuals for HPE D3610

Related product manuals