EasyManua.ls Logo

HPE ProLiant ML110

HPE ProLiant ML110
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
M.2 SSD enablement option
M.2 SSD
T-15 Torx screwdriver
Phillips No.1 screwdriver
Procedure
1. Power down the server on page 23.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
Server in rack mode: Remove the server from the rack on page 23.
Server in tower mode: Position the tower server for hardware configuration on page 25.
5. Remove the access panel on page 25.
6. Remove the PCI air baffle on page 29.
7. Remove the system air baffle on page 30.
8. Install the SSD on the M.2 SSD enablement board:
a. Insert the SSD into the SSD slot at a 45° angle.
b. Carefully press the SSD down to the horizontal position.
c. Secure the SSD with a screw.
Hardware options installation 87

Table of Contents

Related product manuals