EasyManua.ls Logo

HTP MODCON1000 - Page 69

HTP MODCON1000
81 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
69
LP- 428 REV. 9.2.14
d. Re-connect all wiring connections.
e. Inspect the gas valve to assure the O-ring is in place.
f. Replace the (4) screws on the aluminum connector on the gas valve. Turn the gas back on. (IMPORTANT: CHECK FOR
GAS LEAKS BEFORE TURNING THE APPLIANCE ON!)
g. Turn the boiler power back on and create a demand on the boiler. When boiler is lit, observe condensate flow from the
boiler. Be sure the boiler is operating properly.
h. Re-connect the condensate piping to the outside condensate connection.

Table of Contents

Other manuals for HTP MODCON1000

Related product manuals