20
1
Checking Cabinet Installation
Assembling the Cable Connector
2
Checking Installation Environment
No. What to Check For
1 The layout of the cabinet complies with the engineering designs.
2
In pole-mounting mode, the mounting brackets are fixed securely, and the frame is fixed properly
and is not distorted.
3
In wall-mounting mode, the holes for the frame are in proper contact with the holes for the
expansion bolt, and the frame and the wall surface are in proper horizontal contact.
4 In wall-mounting mode, the cabinet is installed securely and does not swing when you shake it.
5
The waterproof cover of the bottom port and the hang chains are bound with the surrounding
cables.
6 The surface of the overall equipment is clean and tidy. The exterior paint is intact.
7 The door and lock of the cabinet are proper.
8 All labels, tags, and nameplates are correct, legible, and complete.
No. What to Check For
1 No fingerprints or other smears exist on the exterior of the equipment cabinet.
2 No excessive adhesive tapes or cable ties exist on the cables.
3 No tapes, cable ties, wastepaper, or packing bags are left around the equipment cabinet.
4 All the items around the equipment are neat, clean, and intact.