13
c
Installing PGND Cables
d
Installing the Chassis in the
Cabinet
Connect PGND cables by using the
removed screws.
Removing Mounting Ears
a
Installing Mounting Ears
b
3
Installing the Chassis in the 23-Inch Cabinet
1.4±0.14 N·M
M4
To the ground point on the
column of the cabinet or the
indoor ground bar
Install the cable tray if provided.
NOTE
2.0±0.2 N·M
M6
cable tray
3.0±0.3 N·M
M6
Store the removed screws properly for installing 23-
inch mounting ears.
NOTE
23-inch mounting ears