EasyManua.ls Logo

Huawei SmartLi Series - 4.5 Combining Cabinets; Install Individual Cabinets; Physically Combine Cabinets; Install PE Cable for Combined Units

Huawei SmartLi Series
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
1. Install each cabinet in sequence according to the installation method of a single cabinet.
2. Combine cabinets.
3. Install a PE cable for each cabinet.
1. The SmartLi supports the combination of up to five cabinets.
2. When multiple cabinets are connected in parallel, only the basic cabinet has an LCD.
3. When cabinets are combined, a battery bus bar box (BBB box) is required. For details about
how to install a BBB box, see PDU8000-(0630,1250, 2000) DCV8-BGA001 BBB Box User
Manual.
Combining Cabinets
4.5

Related product manuals