Figure 7-17 Power adjustment parameters
Table 7-8 Power adjustment parameters
Parameter
Description
Remote power schedule If this parameter is set to Enable, the solar inverter responds
to the remote power scheduling command. If it is set to
Disable, the solar inverter does not respond to the command.
Schedule instruction valid
duration (s)
Adjusts the time for maintaining the scheduling command.
Maximum active power (kW) Species the output upper threshold for the maximum active
power to adapt to dierent market requirements.
SUN2000-(100KTL, 110KTL, 125KTL) Series
User Manual 7 Man-Machine Interactions
Issue 07 (2020-09-15) Copyright © Huawei Technologies Co., Ltd. 95

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-100KTL Series and is the answer not in the manual?

Huawei SUN2000-100KTL Series Specifications