EasyManua.ls Logo

Huawei SUN2000-20KTL - Isolation and Power Control Settings

Huawei SUN2000-20KTL
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SUN2000 (8KTL-28KTL)
User Manual
7 LCD
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
LCD
Operation Procedure
The preceding figure is displayed if you
have logged in to the SUN2000 as
Special User.
----End
7.2.11 Setting Isolation Parameters
This topic describes how to set SUN2000 isolation parameters on the monitoring panel.
Context
To ground PV arrays, install a three-phase four-wire isolation transformer and the parameter
of Isolation is set to Input Grounded, With TF.
Procedure
The following table describes the procedure for setting isolation parameters. The
parameter values in the figures are for reference only.
LCD
Operation Procedure
1. On the default page, press to enter the
main menu.
2. Choose and press .

Table of Contents

Other manuals for Huawei SUN2000-20KTL

Related product manuals