EasyManua.ls Logo

Huawei SUN2000-60KTL-M0 - Space Requirements

Huawei SUN2000-60KTL-M0
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Do not install the SUN2000 on ammable building materials.
The SUN2000 is heavy. Ensure that the installation surface is solid enough to
bear the weight load.
In residential areas, do not install the SUN2000 on drywalls or walls made of
similar materials which have a weak sound insulation performance because
the noise generated by the SUN2000 is noticeable.
4.3.2 Space Requirements
Reserve enough clearance around the SUN2000 and determine an appropriate
installation tilt to ensure sucient space for installation and heat dissipation.
Figure 4-1 Installation space requirements
NO TE
For ease of installing the SUN2000 on the mounting bracket, connecting cables to the
bottom of the SUN2000, and maintaining the SUN2000 in future, it is recommended
that the bottom clearance be in the range of 600 mm to 730 mm. If you have any
questions about the clearances, consult the local technical support engineers.
SUN2000-(50KTL, 60KTL, 65KTL)-M0
User Manual 4 Installation
Issue 11 (2024-02-02) Copyright © Huawei Technologies Co., Ltd. 29

Table of Contents

Other manuals for Huawei SUN2000-60KTL-M0

Related product manuals