EasyManua.ls Logo

Huawei TE80 - Basic Configuration and Verification; Powering on or off the Endpoint

Huawei TE80
178 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HUAWEI TE80 Videoconferencing Endpoint
Administrator Guide
2 Basic Configuration and Verification
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Basic Configuration and Verification
About This Chapter
Before using the endpoint, you must complete basic endpoint configuration, such as setting
basic endpoint information and network parameters, and verify the configuration.
2.1 Powering On or Off the Endpoint
After connecting all the required devices, connect the power supply and then power on the
endpoint.
2.2 Using the Wizard
The Wizard helps you quickly set the general, network, and camera parameters on your
endpoint.
2.3 Verifying the Basic Configuration
After completing the basic configuration, you must verify it by performing call, sound, and
image tests.
2.4 Power Management
The endpoint supports sleep mode. You can set its sleep time and automatic startup and
shutdown time.
2.1 Powering On or Off the Endpoint
After connecting all the required devices, connect the power supply and then power on the
endpoint.

Table of Contents

Related product manuals