EasyManua.ls Logo

Huawei UPS5000-A-30 kVA - Page 28

Huawei UPS5000-A-30 kVA
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 1-15 Lock for the maintenance bypass switch (unit: mm)
----End
Rack-mounted Installation
Step 1 Remove the left and right side panels, handles, front panel, and MDU from the
chassis.
1. Remove the rubber plugs from the UPS.
2. Remove the screws from the mounting ears of the power unit, and remove
the left and right side panels.
3. Remove the handles.
4. Remove the front panel, MDU, and cables from the chassis.
Figure 1-16 Removing the left and right side panels, handles, and MDU from the
chassis
Step 2 Flip the ready switches on the power unit and bypass unit to (not ready).
Remove the screws from the mounting ears of the bypass unit, and remove the
power unit and bypass unit.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide 1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd. 21

Other manuals for Huawei UPS5000-A-30 kVA

Related product manuals