EasyManua.ls Logo

Huawei UPS5000-A-30 kVA - Verifying the Installation

Huawei UPS5000-A-30 kVA
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 1-72 Cable connections for a dual-bus system (60 kVA/80 kVA/120 kVA)
(1) Mains input power
cables
(2) Bypass input power
cables
(3) Battery cables (4) Output power
cables
----End
1.5 Verifying the Installation
CA UTION
Carefully check items 09 and 10 listed in the table. If the check results of these
two items do not meet the acceptance criteria, the UPS may be damaged.
Table 1-7 Check items and acceptance criteria
No.
Item Acceptance Criteria
01 Consistency between the
system conguration and
the product delivery
The system congurations, including
models and the number of units, comply
with the contract.
02 Cable layout Cables are routed properly and meet
engineering requirements.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide 1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd. 55

Other manuals for Huawei UPS5000-A-30 kVA

Related product manuals