M12 bolt
Spring washer
Flat washer
Expansion sleeve
Expansion nut
Concrete floor
3
02
Installing Cabinets
Unpacking
2.1
1600 kVA power cabinet 1
1600 kVA power cabinet 2 + bypass cabinet/
1200 kVA cabinet
Inductor cabinet
Securing Cabinets
2.2
• Installing rectifiers in the inductor cabinet.
• Rectifiers are delivered separately, and
baffle plates are placed in the fitting bag
of the inductor cabinet.
Inductor cabinet
UPS cabinet
unit: mm
A: mounting holes on the channel
steel
B: mounting holes on the floor
Securing the Cabinets (1200 kVA)