3 Product Installation
3.1 Unpacking and Checking
After the top air-ow cabinet is delivered onsite, unpack the case and check as
follows:
● Visually inspect the appearance of the top air-ow cabinet for shipping
damage. If any damage is found, notify the carrier immediately.
● Check that the
ttings comply with the packing list. If some ttings are
missing or do not comply with the packing list, record the information and
contact your local Huawei
oce immediately.
3.2 Installation Tools
Table 3-1 lists the installation tools.
Table 3-1 Tools
Tool
Picture Used To
Step ladder Support work at heights.
Multimeter Check electrical
connections and
measure electrical
parameters.
Insulated Phillips
screwdriver
Connect cables and
tighten screws.
UPS5000 Top Air-ow Cabinet
User Manual 3 Product Installation
Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 7