EasyManua.ls Logo

Huawei UPS5000 - Product Installation; Unpacking and Checking; Installation Tools

Huawei UPS5000
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Product Installation
3.1 Unpacking and Checking
After the top air-ow cabinet is delivered onsite, unpack the case and check as
follows:
Visually inspect the appearance of the top air-ow cabinet for shipping
damage. If any damage is found, notify the carrier immediately.
Check that the
ttings comply with the packing list. If some ttings are
missing or do not comply with the packing list, record the information and
contact your local Huawei
oce immediately.
3.2 Installation Tools
Table 3-1 lists the installation tools.
Table 3-1 Tools
Tool
Picture Used To
Step ladder Support work at heights.
Multimeter Check electrical
connections and
measure electrical
parameters.
Insulated Phillips
screwdriver
Connect cables and
tighten screws.
UPS5000 Top Air-ow Cabinet
User Manual 3 Product Installation
Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 7

Related product manuals