nt
r
C
⢠Sails and Ri
in
12.
It will rotate very rapidly when the sail is unfurled.
Reefin
procedure on the standard mast
1. Run both reefin
lines as illustrated in the boom &
ree
la
out. The shorter ree
line will be used on the
irst
ree
tarboard
ide,
reen
. The lon
er ree
line on the
second reef
Port Side, Red
.
2. L
w
r th
m
in
il
. Ease the mainsheet and van
4. Lower the main sail to approximatel
the first ree
position.
. Take u
the slack in the first reef line until the tack and
th
l
w
r
wn t
t 2ā
v
th
m
. Ad
ust the main hal
ard so that the tack reef point is
not contactin
the
oose neck on the
ront o
the boom
and is appl
in
tension to the lu
o
the main above the
reef, not below. There will be approximatel
6ā
150mm
stretch in the main lu
and main hal
ard when the ree
-
in
line is tensioned, so, make sure that this is allowed
for when ad
ustin
the main hal
ard to locate the tack
r
l
k
7. Confirm that the tack reef
oint is still clear of the tack
shackle and that onl
the main lu
above the ree
crin
le
is tensioned, not the lu
between the crin
le and the top
stacked sail slide. Ease the reef line and read
ust the
hal
ard i
necessar
.
. Mark the hal
ard at the stopper with 1ā
25mm
sin
le
band o
indelible marker ink. B
droppin
the hal
ard to
this mark ever
time, positionin
is made easier. The hal-
ard is automaticall
in the correct position for the reef.
. Repeat the procedure
or the second ree
, usin
double
an
s to mar
t
e
a
ar
n t
e correct pos
t
on.
12.6 Reefin
Procedure
Durin
Sailin
1. Head u
into the wind.
2. Ease the mainsheet and van
.
heck the toppin
li
t
or adequate boom support.
4. Lower the main hal
ard to the appropriate mark and
snu
t
e
ne w
t
t
e sto
er.
. Tension the ree
in
line with the sel
-tailin
winch until
the reef clew is brou
ht down to the boom. Appl
stopper
an
tens
on t
e ma
n
a
ar
ac
up, ease t
e topp
n
li
t
i
needed
.
12.7 Shakin
Out a Reef
1. Head up into the wind.
2. Ease the mainsheet and van
. Release the tension on
the toppin
. Li
t
i
needed
. Release the line sto
er and remove reef line from
win
h.
4. Tension the main hal
ard to raise sail, makin
sure ree
lines run freel
while sail is bein
raised. Appl
stopper
to main hal
ard.
. Re-tension van
and mainsheet, ease the toppin
lift
i
needed
.
12.8 Spinnaker
Optional
o set t
e opt
ona
sp
nna
er us
n
t
e
e
cate
a
ar
,
irst attach the hal
ard to the head rin
on the sail. Next,
tie the tack downhaul line to the tack rin
, lead it throu
h
a turn
n
oc
on t
e
ec
near t
e
ow or t
rou
t
e
block on anchor roller, and run it a
t to the cockpit.
et
up the tack downhaul so the tack of the sail is about
fiv
in
h
v
th
k wh
n th
il i
h
i
t
.
Attach the spinnaker sheet to the clew rin
o
the spinna-
r
n
m
k
r
th
lin
i
l
ft
t
i
th
lif
lin
to a turnin
block on the toe-rail located
ust forward o
the stern pulpit. Then run it
orward to a winch allowin
total slack in the sheet. The sheet that is not bein
used
ā t
e
az
s
eet ā s
ou
a
so
e attac
e
to t
e c
ew
the spinnaker , led
orward
n
ront o
the headsta
n
th
n
k
n th
th
r
i
f th
t ā
t
i
the shrouds and lifelines ā to another turnin
block
positioned
ust
orward o
the stern pulpit. Then take that
sheet and lead it to a winch, with the slack in the sheet.
Now
ou are read
to hoist the spinnaker. Start b
headin
o
to a square run. Leave the mainsail
ull
ut durin
the hoistin
procedure as it will blanket
the spinnaker and keep it from fillin
until
ou are
read
or it to be set. A
ood place to raise the sail
is from the leeward side,
ust ahead of the boom.
nce it is full
hoisted, slowl
head up to
our desired
ourse and pull in the sheet until the sail sets. Make
sure
ou have at least two turns o
the sheet around the
w
n
.