EasyManua.ls Logo

Hypertherm HyPrecision Predictive P-15 - Page 105

Hypertherm HyPrecision Predictive P-15
231 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HyPrecision Predictive waterjet pump Operator Manual 810120 105
5 – Preventive maintenance
Preventive maintenance
Repair the check valves and the low-pressure poppets
This procedure is for a moderately worn check valve. Replace very worn components.
Parts, tools, and materials
Repair the check valves every 500 hours.
Replace the low-pressure poppets every 1,000 hours.
Do not rock the part or use too much pressure. Doing so can cause damage to the part face.
1 2
1
1-11523 Check valve assembly
2
1-14792 Low-pressure poppet
(for HyPrecision P-15/P-30/P-50 pumps)
or
1-11526 Low-pressure poppet
(for HyPrecision P-15/P-30/P-50 pumps)
12-micron lapping paper
(included in the 1-12084 HyPrecision standard
tool kit)
Granite lapping block
(included in the 1-12084 HyPrecision standard
tool kit)
Masking tape
Isopropyl alcohol
Clean towels

Table of Contents

Related product manuals