EasyManua.ls Logo

Hypertherm Powermax 1000 - System Power Up and Parameter Adjustment

Hypertherm Powermax 1000
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Turn the Exhaust fan on
Doing this before the air hose is attached allows you to hear the fan spool up.
This takes about 60 seconds
Do torch checks
Plug the air supply into the plasma cutter
Turn the plasma cutter on
Adjust the gas pressure regulator
Adjust the amperage
Adjust the cut settings in Machine->Settings as needed (see next section)
After changing ANY machine settings, initialize to ensure the settings are good
Make sure the ground clamp is well-attached to the work and out of the way of the carriage as it
follows the cut paths
Move the torch with Machine->Move to (or press V) over the work piece
Check the stock can contain the desired design
Bringing it all Together Power Up

Other manuals for Hypertherm Powermax 1000

Related product manuals