Use the following steps to prepare your raised floor:
1. Cut the following openings in the raised floor for each rack that uses an
Earthquake Resistance Kit:
v Four holes for the rubber bushings of the kit to fit through the floor
v One cable cutout for power and other cables that connect to the rack
Use Figure 24 on page 156 as a guide for the location and dimensions of these
openings.
Figure 23. Earthquake Resistance Kit, as installed on a raised floor
Chapter 6. Meeting DS8000 series delivery and installation requirements 155