3. Gently push the power supply assembly into the chassis until it is firmly seated.
4. Plug the power cord into the power supply assembly and power is provided to the device
immediately.
5. Verify that the LED on the new power supply assembly displays a steady green light while the device
is operating. If the LED is not a steady green, ensure that the power supply is securely installed and
seated properly.
6. Optional: Enter psshow to display the PSU status. The power supply assembly status can also be
viewed using Web Tools.
Verifying the operation of the power supply and fan assemblies
About this task
You can use the following commands to verify that the power supply and fan assemblies are operational:
v psShow
v fanShow
v switchShow
v errDump
Refer to the Fabric OS Command Reference for output examples and descriptions.
Power Supply Assemblies 63

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Storage Networking SAN128B-6 and is the answer not in the manual?

IBM Storage Networking SAN128B-6 Specifications

General IconGeneral
BrandIBM
ModelStorage Networking SAN128B-6
CategorySwitch
LanguageEnglish

Related product manuals