EasyManua.ls Logo

ICON DPC1 - Function switch setting - DRAINAGE WITH AUTOMATIC PUMPS

ICON DPC1
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BIA-DPC1 rev 4 Page 16
2.2a Function switch setting DRAINAGE WITH AUTOMATIC PUMPS
Installers can set the function switch to meet different applications. Before setting the function
switch, the control panel should be disconnected from the power supply.
After completing the setting, apply power to the control panel and observe the application sign
displayed on the LCD conforming to the DRAINAGE symbol.
DRAINAGE SETTING DRAINAGE SYMBOL
FOR AUTOMATIC PUMPS
MCB

Table of Contents