EasyManua.ls Logo

IDEAL 7228-95 - Installation Guide; Preparation for Installation

IDEAL 7228-95
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 5 -
2. Installation
- Transport the machine on the pallet to its
destination using a pallet-jack.
- 6 strong people are required to lift the machine
from the pallet.
- The machine should be installed on a sturdy, dry
and level floor.
Danger!
- The machine must not be located outside.
- Do not use in the vicinity of inflammable
liquids or gases.
- Do not use in humid environments.
- Protect mains cable against heat, oil and
sharp edges.
2.1 Preparing for Installation
The machine is delivered ready for operation. As an
option, side tables, left and right, are available.
These should be mounted so that the surfaces are
level with the main table.
Danger!
The machine must not be put into operation
without the safety light beam.

Related product manuals