EasyManua.ls Logo

IDEAL C35 - Expansion Vessel Recharging and Replacement; Boiler Sealing Panel Seal Replacement

IDEAL C35
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
sERVICINg
Independent + Combi - Installation and Servicing
68
BOILER sEaLINg paNEL sEaL REpLaCEMENT
67
ExpaNsION VEssEL REChaRgINg & REpLaCEMENT
8
9
1. Refer to Frame 40.
2. Remove the old seal from the casing and
thoroughly clean the casing surfaces.
3. Fit the new seal, ensuring the bottom joint
provides an air tight seal.
5. Reassemble in reverse order.
6. Check operation of the boiler. Refer to
Frames 29 & 30.
Note. Ensure that the boiler front panel is
correctly sealed, compressing the seal
to make an airtight joint.
REChaRgINg
1. Refer to Frame 40.
2. Remove the charge point cover.
3. Recharge the tank pressure to 0.75 bar.
4. Re-assemble in reverse order
5. Check operation of the boiler. Refer to Frames
29 & 30.
REpLaCEMENT
6. Refer to Frame 40.
7. Drain the boiler CH circuit. Refer to Frame 55.
8. Unscrew the union nut on the vessel water
connection pipe.
9. Support the expansion vessel and unscrew the 2
screws from the securing clamp, located on the
top of the boiler, and remove. (Note the position
of the bracket on the vessel)
10. Remove the expansion vessel.
11. Fit the new expansion vessel.
12. Reassemble in reverse order.
13. Rell the boiler.
14. Check operation of the boiler. Refer to Frames
29 & 30.
Recharge
Point
sERVICINg
Unit 3A, Thornton Road Ind. Estate Off Hockney Road Bradford, BD8 9HQ
01274 488 388
www.heatingspares247.com

Table of Contents

Related product manuals