EasyManua.ls Logo

IDEAL Evomax 30 - Page 23

IDEAL Evomax 30
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
EVOMAX -
Installation & Servicing
INSTALLATION
INSTALLATION
1. INTERNAL TO SINK WASTE
UPSTREAM OF SINK WASTE TRAP
Notes: ALL EXTERNAL PIPE RUNS MUST BE IN ACCORDANCE WITH BS 6798
28
CONDENSATE PIPE TERMINATION CONFIGURATIONS
2. INTERNAL CONNECTION TO SOIL AND VENT STACK
* Make connection to SVP using a solvent welded saddle
BOILER
External
wall
Ground Level
Open end of pipe
direct into gulley
below grating but
above water level
DRAIN
cla7775
3. TERMINATION TO SOAK AWAY
 
BOILER
External
wall
Ground Level
Termination
to Soak away
cla7774
minimum
500mm
BOILER
esp8882
BOILER
cla7771a
DRAIN
Ground Level
Open end of pipe
direct into gulley
below grating but
above water level
206210-3.indd 23 09/06/2011 13:34:28

Other manuals for IDEAL Evomax 30

Related product manuals