EasyManuals Logo

IDEAL HE9 Installation And Servicing

IDEAL HE9
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
7
mexico HE - Installation & Servicing
General
OPERATION
When there is a demand for heat, the heating system is supplied
at the selected temperature of between 30
o
C and 82
o
C.
The boiler features a comprehensive diagnostic system which
gives detailed information on the boiler status when operating, and

SAFE HANDLING
This boiler may require 2 or more operatives to move it to its
installation site, remove it from its packaging base and during
movement into its installation location. Manoeuvring the boiler
may include the use of a sack truck and involve lifting, pushing
and pulling.
Caution should be exercised during these operations.
Operatives should be knowledgeable in handling techniques when
performing these tasks and the following precautions should be

 
 
 

be made to ensure the following unless unavoidable and/or the
weight is light.
 
 
 
 
 
 
 if required.
OPTIONAL EXTRA KITS
FLUING:
Flue Extension Ducts. (1000mm long)


90
o
Elbow Kit (60/100 dia maximum no. per installation)


45
o
Elbow Kit (60/100 dia maximum no. per installation)


Concentric Flue Screw Retaining Kit
Roof Flue Kit (60/100)


Pitched Roof Tile 
Flat Roof Tile 
Vertical Flue Adaptor
Vertical Outlet Flue Kit with Elbow (60/100)


Flue Finishing Kit
High Level Flue Outlet Kit
Flue Deector Kit
OTHER OPTIONAL KITS:
Remote User Control Kit
Condensate Pump Kit
Concealment Panel Kit
RS Boiler Terminal Wall Plate Kit
Adjustable Flue Support Bracket
SAFETY
Current Gas Safety (Installation and Use) Regulations or
rules in force.

should be installed in accordance with the rules in force.
In GB, the installation must be carried out by a Gas Safe


 
 
Regulations, The Building Regulations (Scotland), Building
Regulations (northern Ireland).
 
 

made to the relevant British Standard Code of Practice.

Installer and installed in accordance with the current edition


rules for electrical installation.
       

BS. 5440:1 Flues (for gas appliances of rated input not
exceeding 70 kW).
BS. 5440:2 Ventilation (for gas appliances of rated input not
exceeding 70 kW).
BS. 5449 Forced circulation hot water systems.
BSEN. 12828:2003 
water based heating systems.
BSEN 12831:2003 
calculation of the design heat load.
BSEN 14336:2004 
and commissioning of water based heating
systems.
BS. 5546 Installation of gas hot water supplies for domestic
purposes (2nd Family Gases).
BS. 6798 
input not exceeding 60 kW.
BS. 6891 Low pressure installation pipes.
Health & Safety Document No. 635
The Electricity at Work Regulations, 1989.
The manufacturers notes must NOT be taken, in any way, as
overriding statutory obligations.
IMPORTANT.
and performance. It is, therefore, important that no external

directly connected to these appliances unless covered by
these Installation and Servicing Instructions or as otherwise
recommended by Ideal Boilers in writing. If in doubt please
enquire.
Any direct connection of a control device not approved by Ideal
Boilers
warranty. It could also infringe the Gas Safety Regulations and
the above regulations.
SAFE HANDLING OF SUBSTANCES
Care should be taken when handling the boiler insulation panels,
which can cause irritation to the skin. No asbestos, mercury or
CFCs are included in any part of the boiler or its manufacture.

Other manuals for IDEAL HE9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL HE9 and is the answer not in the manual?

IDEAL HE9 Specifications

General IconGeneral
BrandIDEAL
ModelHE9
CategoryBoiler
LanguageEnglish

Related product manuals