EasyManuals Logo

IDEAL LOGIC+ Combi 30 Installation And Servicing

IDEAL LOGIC+ Combi 30
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #67 background imageLoading...
Page #67 background image
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
Benchmark Commissioning and
Servicing Section
It is a requirement that the boiler is installed and commissioned to the
manufacturers instructions and the data fields on the commissioning checklist
completed in full.
To instigate the boiler guarantee the boiler needs to be registered with the
manufacturer within one month of the installation.
To maintain the boiler guarantee it is essential that the boiler is serviced annually
by a Gas Safe registered engineer who has been trained on the boiler installed.
The service details should be recorded on the Benchmark Service Interval
Record and left with the householder.

Other manuals for IDEAL LOGIC+ Combi 30

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL LOGIC+ Combi 30 and is the answer not in the manual?

IDEAL LOGIC+ Combi 30 Specifications

General IconGeneral
ModelLOGIC+ Combi 30
Boiler TypeCombi
Central Heating Output24.2 kW
Domestic Hot Water Output30.3 kW
Efficiency Rating94%
ErP RatingA
Flow Rate12.4 l/min
Dimensions700x395x278 mm
Fuel TypeNatural Gas
MountingWall Mounted
Warranty7 years
Central Heating Pressure3 Bar

Related product manuals