27
Fit the upper assembly rods (body accessories pack) in the
order given in the figure above. Place the expansion spring
and its washer on each rod towards the rear. Stop tightening
the nuts when the free space between the threads is about 2
mm.
Fix the upper casing supports (pack IE 13) and the upper
crosspieces (packs IE 10, 11, 12, 14) with the assembly rods.
(body accessories pack) as shown in details A, Aā, B & C.
Fit the lower assembly rods in the order given in the figure.
Remove the assembly tool.
Fitting the assembly rods and upper casing supports
8
Viceroy GT Range - Installation
ASSEMBLY
GT 8
GT 9
GT 10
GT11
GT12
GT13
GT14