EasyManua.ls Logo

IKA RC 2 lite - Device Operation Basics; Switching the Device On; Setting and Starting Tempering

IKA RC 2 lite
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16 17
/// Setting temperature
/// Starting tempering function
/// Switching on
Operation
!
Notice!
Before commissioning, make sure that the device has not been moved in one hour.
The socket used must be earthed (fitted with earth contact).
Observe the ambient conditions (temperature, humidity etc.) listed under “Technical Data”.

Related product manuals