EasyManua.ls Logo

Incon TS-LLD - TS-LLD LSU Installation; LSU Installation Steps

Default Icon
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LSU Installation Page 2.2 - 7 2.2
Figure 2.2-8 Line Leak Detector Wiring – FE Petro Pump Housing
DANGER
Make sure you check these wires for the absence of power
before proceeding. All pump power (240 VAC) and pump relay / dispenser power
must be off before this installation is started, otherwise a lethal hazard will be
created which could kill you or others.
Note:
A circuit breaker contact(s) can
stick closed even when the circuit breaker is in the off position.
8) Leak Sensing Unit Wiring – Reference Figure 2.2-7, or 2.2-8.
a) Use one of the supplied red wire nuts, and twist one wire lead from pump
together with one of the black wire leads from the LSU.
b) Again use a red wire nut, and twist the remaining lead from pump together
with the remaining black wire lead from the LSU.
c)
For Canadian TS-LLD leak sensing units only:
connect the green (ground)
wire from the pump to the green LSU wire.
PUMP
HOUSING
STATION
CONDUIT
PORT
M I CABLE
ADAPTER
M I CABLE
PIPELINE
LINE LEAK
DETECTOR