EasyManua.ls Logo

Incon TS-LLD - Note

Default Icon
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.2 Page 2.2 - 12 TS-LLD INSTALLATION GUIDE
Figure 2.2-13 Typical Installation INCON TS-LLD Line Leak Detector
INCON TS-LLD Line Leak Detector
Typical Installation in Leak Detector Port
TS-LLD LSU # 1
(Leak Sensing Unit # 1)
at submersible
pump housin
g
Tank - Pump # 1
Electrical
Power Panel
Pump
Relay
Boxes
NOTE:
A TS-TGI Tank Gauge Interface
module is required to connect
the TS-LLD Line Leak Detector
system to an INCON TS-1000
Tank Sentinel console.
See the TS-TGI Install Manual.
Existing
Conduit
(Pump 2)
Existing
Conduit
(Pump 1)
Submerged
Turbine
Pump
1
2
TS-LLD CUs
(Control Units):
# 2 and # 1
TS-LLD LSU # 2
(Leak Sensing Unit # 2)
at submersible
pump housin
g
Tank - Pump # 2
Epoxy
Filled
EYS
Seal
Fitting
Dispenser
# A
Explosion-
proof
Junction
Box
Dispenser
# X
NOTE:
A TS-TGI Tank Gauge Interface
module is required to connect the
TS-LLD Line Leak Detector system
to an INCON TS-1000 Tank Senti-
nel console. See the TS-TGI Install
Manual.
For TS-1001/2001 Tank Sentinel
consoles, use the LLD /
I
interface
...see the OPTIONAL TS-LLD TANK
SENTINEL ATG CONSOLE
INTERFACE chapter in this manual.
Reference Schematic Figure 2.3 - 8