EasyManua.ls Logo

INOV8 F240 - SECTION 5 -DETAILED SERVICING PROCEDURES

INOV8 F240
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INOV8 Model F240 – Edited September 2008
29
CHIMNEY INSPECTION
At the end of each heating season check the entire chimney, inside and outside.
Unfasten the clean out cap at the bottom of the chimney Tee and empty the residue. At
the same time check the chimney and the flue to see if there is enough residue build-up
to require cleaning the chimney. The summer humidity mixes with the ash producing
acids that will corrode the chimney pipe. Replace broken or rusted sections. Make sure
any guy wires and wall supports are secure, and re-caulk roof flashing. Check the
chimney top to insure it has not been damaged in a storm. Insure that the barometric
draft control operates freely.
SUMMER BURNER REFURBISHING PROGRAM
During the early summer months, INOV8 provides a burner-reconditioning program. This
involves returning the burner to the factory. It will be completely disassembled,
thoroughly cleaned, reassembled, inspected, tested and all settings returned to factory
specs. Defective, worn and unreliable components will be replaced. If desired, optional
equipment updates will be installed. Upon request samples of waste oil will be tested
and measured for flash point and a report provided for your files.
When sending the burner in for this service be sure to notate your company name,
contact information, phone number and any performance details that would be helpful to
the technician. These burners are returned in order of their receipt. The best time to
send a burner in is during the months of May, June and July during INOV8’s slower time.
The work is discounted 20% to encourage participation ONLY during these three months.
Burners sent in for service after July risk receiving them back in time for the heating
season.
When packaging the burner for shipping remember to plug the oil lines as the oil will leak
out damaging the packaging material and shipping damage can occur. Also protect
the Fireye control from damage. Replacing the Fireye will be hundreds of dollars.
Do not use newspapers as packing materials – preferably use several layers of
bubble wrap. INOV8 sells burner boxes with all necessary packing materials already
included for $10 per box. It can be shipped to you.

Table of Contents