9
Recommended installation of the IFPM/S-units to the tank
4.1.2. Electrical connection
• The electrical connection is made with a CEE three phase current connector
according IEC 60309 with phase changing switch
• Before initial operation please check the position of the ball valves:
OIL OUT closed
WATER OUT open
IN open
4.1.3. Checking the rotating direction
• The checking of the rotating direction must be made as follows:
- Switch on the machine
- Wait for the display message
• By short hitting the button [
] (yes) (maximum 2 seconds) the motor of the hydraulic
pump will be started.
• The correct rotating direction is marked with an arrow at the housing of the motor.