EasyManua.ls Logo

Iowa Precision Cornermatic Plus - Operation Preparation and Shutdown; Operation Preparation and Placement; System Shut-Down

Default Icon
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 3-4
CORNERMATIC PLUS
3. Insert new corner pre-packaged sleeve of corners.
4. Close presser cover.
D. PREPARATION FOR OPERATION
1. Apply electrical power by pressing in the push-button POWER ON switch. The switch will
be illuminated green when power is applied.
2. Apply air pressure to the machine.
3. Slide the duct fitting with the TDC/F flange into position in the Cornermatic Plus. When the
two levers, one located on each side of the bottom head duct fitting corner, are both
activated by the duct fitting, the cycle will start. After completion of the cycle, pull the duct
fitting away from the heads, rotate the duct fitting to the next corner, and repeat the
procedure. Repeat this procedure until all four corners of the duct fitting are completed, if
applicable.
Figure 3-4 Duct fittings Placement
E. SYSTEM SHUT-DOWN
1. Remove Air Pressure from the system.
2. Press DOWN on the control panel POWER OFF push-button switch. The ON control
switch lamp should extinguish.
H. WEISS MACHINERY & SUPPLY
H. WEISS MACHINERY & SUPPLY
PHONE: (718) 605-0395 - www.hweiss.com