EasyManua.ls Logo

ISCO GLS - Sampler Preparation Checklist

ISCO GLS
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GLS Sampler
1-2
1.2 Sampler Preparation
Checklist
The following checklist can be used as a guide
to prepare the GLS for each use.
1. Inspect the pump tube.
See Section 1.3.
2. Check the discharge tube.
See Section 1.4.
3. Install the bottle.
See Section 1.5.
4. Icing the bottle (optional).
See Section 1.6.
5. Connect a power source.
See Section 1.7.
6. Connect a suction line and
strainer. See Section 1.8.
7. Connect external devices
(essential for flow-paced
sampling or sampler
inhibiting). See Section 1.9.
8. Place the GLS in position. See
Section 1.10.
9. Calibrate sample volumes
(optional). See Section 2.7.
10. Lock the GLS (optional). See
Section 1.11.