EasyManuals Logo

ITech IT7800 Series User Manual

ITech IT7800 Series
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #54 background imageLoading...
Page #54 background image
Operation and Application
Copyright ©ITECH Electronic Co., Ltd. 52
(s)
Selected
Test item selection:
Select to Yes, indicates the test item will be executed.
Select to No, indicates the test item is not executed.
More
Click More to enter the configuration interface of other parameters, and set
the Rise time and Fall time.
Run/Stop
running or stopping the regulation tests. You must enable the output before
running. Otherwise, a message is displayed indicating that the output is not
enabled.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ITech IT7800 Series and is the answer not in the manual?

ITech IT7800 Series Specifications

General IconGeneral
BrandITech
ModelIT7800 Series
CategoryAC Power Distribution
LanguageEnglish

Related product manuals