Quick Start
Copyright © ITECH Electronic Co., Ltd. 21
If the instrument is the cabinet type, the rear panel of the cabinet provides a
master power switch. The relationships between the device status and switch
status are listed in the following table.
Power-On
The normal power-on process of the electronic load is as follows:
1. Properly connect the power cord and press [Power] to power on the
instrument.
The LCD screen displays the electronic load version and time information.
2. After initialization, the LCD screen displays the following information.
NOTE
In case of any error, self-test will stop. Contact ITECH sales agent or technical service
engineer.
3. Press [Menu], and the LCD screen of the electronic load displays the system
information.
ООО "Техэнком" Контрольно-измерительные приборы и оборудование www.tehencom.com