EasyManuals Logo
Home>ITech>Test Equipment>IT8625

ITech IT8625 User Manual

ITech IT8625
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #45 background imageLoading...
Page #45 background image
Basic Operations
Copyright © ITECH Electronic Co., Ltd. 36
Take the parallel connection of three IT8628 electronic loads as an
example.
Select two electronic loads as the slave.
1. Press [Menu] to enter the system menu setting interface.
2. Select [PARALLEL SETUP] to enter the parallel setting interface.
3. Press the Up and Down key to select the “Operating Mode” > “Parallel”.
4. Set “Phase Class” as “Single”.
5. Set “Phase/Position” of each unit as Slave-B(2)” and “Slave-C(3)”.
ООО "Техэнком" Контрольно-измерительные приборы и оборудование www.tehencom.com

Table of Contents

Other manuals for ITech IT8625

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ITech IT8625 and is the answer not in the manual?

ITech IT8625 Specifications

General IconGeneral
BrandITech
ModelIT8625
CategoryTest Equipment
LanguageEnglish

Related product manuals