Basic Operations 
  Copyright © ITECH Electronic Co., Ltd.  41 
Then  the  user  can  configure  the  Phase  A/B/C  of  three  electronic  loads  on 
master. 
1.  Press [Menu] to enter the system menu setting interface. 
2.  Select [PARALLEL SETUP] to enter the parallel setting interface. 
3.  Press the Up and Down key to select the “Single/Three Phase” > “A+B+C”.   
4.  Press [EDIT PHASE], configure the Phase A/B/C of three electronic loads, 
as shown below. 
 
 
5.  Press [Enter] to save the setting.   
 
After saving the  settings, the user  must power off the  master and power  on 
again. The interface of master is shown as below. 
 
 
⚫  Take the example of IT8628 electronic load 
Select two electronic loads as the slaves. 
1.  Press [Menu] to enter the system menu setting interface. 
          ООО "Техэнком"     Контрольно-измерительные приборы и оборудование     www.tehencom.com