EasyManua.ls Logo

Ivoclar Vivadent Programat CS - Installation and Initial Start-Up; Unpacking and Content Verification; Location Selection and Assembly

Ivoclar Vivadent Programat CS
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
4. Installation and Initial Start-Up
4.1 Unpacking and checking the contents
The packaging provides the following advantages:
Reusable packaging
Closing mechanism with integrated transporta-tion grips
Ideal protection by Styrofoam inserts
Easy handling / optimum unpacking
The packaging may be used in several ways (modules)
Remove the furnace components from their
packaging and place it on a suitable table. Please observe the
instructions on the outer packaging.
There are no special transportation grips on the furnace. Support the
bottom of the furnace to carry it.
Check the deliv-
ery for com-
pleteness (see
delivery form in
Chapter 9) and
transportation
damage. If parts
are damaged or
missing, contact
your local Ivoclar
Vivadent Service Center.
Packing and shipping of individual components:
The packaging of the Programat CS permits simple and safe shipping
of individual components. Simply use the two corresponding inserts.
Fold the side flaps (2) and combine the two packaging parts by
means of the transportation flaps. The packaging may be disposed
with the regular household refuse.
4.2 Selecting the location
Place the furnace on a flat table using the rubber feet. Make sure
that the furnace is not placed in the immediate vicinity of heaters or
other sources of heat. Make sure that air may properly circulate
between the wall and the furnace.
Also ensure that there is enough space between the furnace and the
user, as the furnace releases heat during the opening of the furnace
head.
The furnace should neither be placed nor operated in areas
where there is an explosion hazard.
4.3 Assembly
Make sure the voltage indicated on the rating plate (19) complies
with the local power supply. If this is not the case, the furnace must
not be connected.
We recommend keeping the original packaging for future
service and transportation purposes.
Step 1:
Assembling the cooling tray (34)
Remove both screws (35) including the silicone washer (47) for the
cooling tray (34).
19
47
35
47
35

Related product manuals