EasyManua.ls Logo

Ivoclar Vivadent Programat CS4 - Page 15

Ivoclar Vivadent Programat CS4
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Step 3:
Mounting the furnace head
The complete furnace head is best mounted with
the rear panel of the furnace pointing towards the
user. Lift the furnace head with both hands as
shown in the picture (with the rear hand gripping
the holding area lined with sandpaper on the
furnace head), and carefully position it on the
furnace head mounting (35).
Ensure that the furnace head mounting mark (33)
is aligned with the furnace base mounting mark
(34).
Make sure that the sintering
chamber and the insulation (1)
are not damaged by mounting
the furnace head.
33
34
40
41
Step 4:
Attaching the grounding band
Attach the grounding band (46) to the corre-
sponding connection of the furnace housing using
the screw for the grounding band (47).
47
46
35

Table of Contents

Related product manuals