Page 18
J-400
8.0 Spa Fill Up Procedure
For best results, read each step in its entirety before proceeding with this
procedure. Make sure that all drains and drain plugs are closed, page
13.
1. Prepare The Spa For Filling
• Clear all debris from the spa. (Although the spa shell has been
polished at the factory, you may want to treat it with a specially
formulated spa cleaner.) Consult your authorized Jacuzzi dealer for
additional information prior to lling spa.
• Remove both ProClarity™ and ProClear™ Plus skimmer, polishing
lter lids and lters as illustrated in Section 13.1 (page 61).
Export 50 Hz (Two and Three Breaker Connections)
Dual Service Breakers
Service 1/Service 2
Breaker***
Three Phase Service
Service 1 /Service 2/
Service 3 Breaker****
Voltage:
230 VAC 230 VAC
Max. Current Draw:
1-Pump System
2-Pump System
3-Pump System
12A/10A
12A/17A
12A/24A
N/A
12A/10A/7A
12A/10A/14A
Wattage:
1-Pump System
2-Pump System
3-Pump System
2,8kW/2,3kW
2,8kW/3,9kW
2,8kW/5,5kW
N/A
2,8kW/2,3kW/1,6kW
2,8kW/2,3kW/3,2kW
Frequency:
50 Hz 50 Hz
Number of Wires:
5 5
*** In this conguration, the heater will operate while one or two jets
pumps are running.
For 1- or 2-pump system, the service 1 breaker will include connections
for the heater and transformer. The service 2 breaker is for all other
components.
For 3-pump system, the service 1 breaker will include connections
the for heater and transformer. The service 2 breaker is for all other
components.
****
In this conguration, the heater will operate while all jets pumps are
running. The service 1 breaker will include connections for the heater
and transformer. Service 2 breaker is for pump 1 and other compo-
nents. Service 3 breaker is for pump 2 and pump 3.