EasyManua.ls Logo

jcb JS130 - Page 299

jcb JS130
533 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 - 9
Centre Bypass Valve (3 Spool Section)
Dismantling
1 Remove end cap 1.
2 Remove ‘O’-ring 2 and discard.
3 Withdraw spool 3.
4 Encase spool in holder and clamp into a vice.
Note: See page 34 - 4 for details of holder.
5 Slacken and remove locknuts 4, spring seating washers
5 and spring 6.
Cleaning, Inspection
1 Clean all parts with clean oil and dry with compressed
air. Inspect all parts.
2 Ensure spool 3 moves smoothly.
3 Check the spring has no defects, deformation or wear.
4 Remove slight defects by lapping.
5 Renew damaged or badly worn parts.
Assembly
Assembly is the reverse of the dismantling procedure.
Torque Settings
1 60 Nm (44 lbf ft)
4 25 Nm (18 lbf ft)
Section E Hydraulics
9803/6410
Section E
34 - 9
Issue 1
Control Valve
JS01080
JS01100
JS01090

Table of Contents

Related product manuals