EasyManua.ls Logo

jcb JS130 - Page 310

jcb JS130
533 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 - 20
Load Check Valve (Boom and Slew)
Dismantling
1 Remove housing 1.
2 Remove ‘O’-ring 2, back-up ring 3 and discard.
3 Remove spring 4 and check valve 5.
4 Remove nylon plug 6.
Cleaning, Inspection
1 Clean all parts in clean oil and dry with compressed air.
Inspect all parts.
2 Ensure check valve 5 moves smoothly.
3 Check that spring 4 has no defects, deformation or
wear.
4 Remove slight defects by lapping.
5 Renew damaged or badly worn parts.
Assembly
Assembly is the reverse of the dismantling procedure.
Note: Renew nylon plug 6.
Torque Settings
1 97.63 Nm (72 lbf ft)
Section E Hydraulics
9803/6410
Section E
34 - 20
Issue 1
Control Valve
JS01370
JS01380

Table of Contents

Related product manuals