34 - 20
Load Check Valve (Boom and Slew)
Dismantling
1 Remove housing 1.
2 Remove ‘O’-ring 2, back-up ring 3 and discard.
3 Remove spring 4 and check valve 5.
4 Remove nylon plug 6.
Cleaning, Inspection
1 Clean all parts in clean oil and dry with compressed air.
Inspect all parts.
2 Ensure check valve 5 moves smoothly.
3 Check that spring 4 has no defects, deformation or
wear.
4 Remove slight defects by lapping.
5 Renew damaged or badly worn parts.
Assembly
Assembly is the reverse of the dismantling procedure.
Note: Renew nylon plug 6.
Torque Settings
1 97.63 Nm (72 lbf ft)
Section E Hydraulics
9803/6410
Section E
34 - 20
Issue 1
Control Valve
JS01370
JS01380