Do you have a question about the JCM iVIZION and is the answer not in the manual?
Power Supply | 12V DC |
---|---|
Note Acceptance | Multi-currency |
Operating Temperature | 0°C to 50°C |
Operating Voltage | 12V DC |
Connectivity | USB, RS-232 |
Operating Humidity | 30% to 85% RH |
Protocols | CCNet, MDB |
Acceptance Speed | Approximately 2 seconds |
Note Orientation | All four orientations |
Storage Temperature | -20°C to 60°C |
Illustrates key components of the iVIZION Validator Head, Transport Unit, and Cash Box for reference.
Lists necessary tools and cleaning supplies for proper maintenance of the iVIZION Banknote Validator.
Directs users to essential manuals for detailed operational and maintenance information.
Step-by-step instructions for cleaning the cash box sensors, gears, and interior surfaces.
Details required monthly cleaning tasks for the Validator Head, Transport Unit, and Cash Box.
Specifies semi-annual inspection and cleaning tasks for the Validator Head, Transport Unit, and Cash Box.
Outlines annual procedures including inspection, testing, and software verification for the unit.
Instructions for cleaning the Validator Head's bill path and optical sensor lenses.
Procedures for cleaning optical sensors and the feed-in mechanism in the Transport Unit.
Details inspection and cleaning of drive belts, lenses, rollers, and dust removal for the head.
Instructions for inspecting lenses, drive belts, and cleaning rollers in the Transport Unit.
Refers to monthly procedures for annual cleaning of the Validator Head.
Covers annual procedures including inspection, gear cleaning, and testing for the Transport Unit.
Covers reassembly, calibration, and statistic initialization after annual cleaning.
Involves reassembly, statistic initialization, and ensures the unit is ready for service.
Details visual inspection for damage and checking performance statistics using JCM Tool Suite.
Focuses on checking statistics for error codes and performing a visual inspection of the unit.