iPRO-RC
Series
Banknote Recycler
Operation and Maintenance
Manual
(Revision 3)
P/N 960-000164R_Rev. 3 {EDP #213631}
Issue #4088-SME-00-03

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the JCM iPRO-100-SH2-RC and is the answer not in the manual?

JCM iPRO-100-SH2-RC Specifications

General IconGeneral
BrandJCM
ModeliPRO-100-SH2-RC
CategoryBank Note Validator
LanguageEnglish

Summary

General Information

Description and Unit Assembly

Overview of the iPRO-RC unit, including assembly and initial descriptions.

Precautions and Safety

Safety instructions, installation, mounting, and general user precautions.

Specifications and Dimensions

Technical, environmental, electrical, and structural specs, plus unit dimensions.

Technical Contact Information

Contact details for different regions for technical support.

Installation

Installation Procedures

Steps for physically installing the iPRO-RC unit into a host machine.

Configuration and Connectivity

Cable interconnection, DIP switch settings, and connector pin assignments.

Maintenance and Cleaning

Preventive maintenance, banknote restoration, retrieval, and cleaning procedures.

Interface Schematics and Flowcharts

Diagrams of interface circuits and operational flowcharts for unit functions.

Disassembly/Reassembly

Tool Requirements and Board Removal

Tools needed for disassembly and procedures for removing power and CPU boards.

Sensor and Motor Assembly Removal

Steps for removing various sensors and motor assemblies.

Component Removal Procedures

Instructions for removing solenoids, circuit boards, and sensors.

Drive Mechanism Disassembly

Procedures for removing timing belts, rollers, and gears.

Wiring Diagrams

Entire System Wiring Diagram

Overall wiring diagram for the iPRO-RC unit.

Partial Unit Wiring Diagrams

Detailed wiring diagrams for transport and frame units.

Performance Tests

Tool Installation and Firmware Download

Installing the JCM Tool Suite and downloading unit firmware.

Calibration Procedures

Steps for sensor calibration, including reference paper usage.

Individual Sensor Tests

Performing individual sensor calibrations and tests using the maintenance tool.

Non-PC Performance Tests

Procedures for running performance tests without a PC.

Exploded Views and Parts Lists

Unit Exploded Views

Visual breakdowns of the entire unit and its main frame components.

Frame Unit Parts Lists

Detailed parts lists for Frame Unit 1.

RC Space Exploded Views and Parts Lists

Exploded views and parts for RC Space 1.

Transport Assembly Exploded Views and Parts Lists

Exploded views and parts for Rear Transport Assembly 1.

Cash Box Exploded Views and Parts Lists

Exploded views and parts for WBA-SH2 Cash Box View 1.

Large Cash Box and Lock Unit Parts

Exploded views and parts for Large Cash Box Frame and Optional Lock Unit.

Troubleshooting

Introduction and Overview

General troubleshooting guidance, including initial checks and overview.

LED Error Codes and Indicators

Explains LED status for error codes on iPRO Transport and RC units.

Unit Guide Replacement

Procedures for replacing length and width guides in the recycler unit.

Maintenance Equipment and Paper Handling

Required maintenance equipment and proper handling of reference paper.

Glossary

Key Terms A-F

Definitions of terms from Anti-Pullback Mechanism to E-Clip.

Key Terms H-R

Definitions of terms from Friction Roller System to RC Bin Space.