1 Removethebackpanelofthefurnace
2 Removethenutswhichholdtheheatingplatewirestothepowerterminalsandstraightentheheating
platewires(Figure4)
3 OpenthefurnacedoorandfindthetwoceramicsectionsatthefrontofthefurnacechamberHoldthe
furnacedoorpartiallyopenwhileremovingtheceramicsectionsTheyarenotreadilyremovedwhenthe
doorisfullyopenRemovetheright-handceramicsectionbyliftingitupwarduntilthebottomofthesection
clearsthesheetmetalhousingPullthebottomoftheceramicsectionout,thenpullitdownsotheupper
halfclearsthesheetmetalhousingRemovetheleft-handceramicplateinthesameway
4 Removethefloorplate,thencarefullyslidethetwosideheatingplatesoutthefrontofthefurnaceThetwo
rearheatingplatesonInfinityL-30maynowberemoved
5Checktheconditionofthefillerstripinsulationinthespacetotheleftandrightoftheceramicfront
sectionsReplaceifrequired*
6Checktheconditionofthefloorplatewhichprovidesinsulationandservesasaspacerbetweenthebottom
endsoftheheatingplatesReplaceifrequired*
7ToinstallthenewheatingplatesreversetheprocedurePushtheceramicheatingplatesbackintoplaceon
therearinsulatingpanelWhenreconnectingtheheatingplatewiresattherearofthefurnace,besureto
replaceallhardwareinitsoriginalposition(Figure4)Tightenallconnections
*ReplacementPart:FloorPlatew/FillerStripInsulation
InfinityM-30:PN33980;InfinityL-30:PN33981
FIELD SERVICE
REPLACEMENT OF HEATING PLATES
REPLACEMENTPARTNUMBERS
21
100V 115V 220/230V 240V
M-30 (Setof2) 18907 33915 33916 33916
L-30
Setof2SidePlates 27957 33918 27957 33918
Setof2RearPlates 27956 33917 27956 33917