JOHNSON CONTROLS
32
FORM 130.13-NOM8 (1021)
INSPECTION & START-UP CHECKLIST
(BASED ON UNIT CONFIGURATION, SOME CHECKLIST ITEMS MAY NOT BE APPLICABLE)
1. RECEIVING AND INSPECTION
Unit Received Undamaged
Unit Arrangement/Hand Correct
Unit Received Complete as Ordered
Unit Structural Support Complete & Correct
2. HANDLING AND INSTALLATION
Unit Mounted Level & Square
Proper Electrical Service Provided
Proper Service Switch/Disconnect Provided
Proper Access Provided For Unit & Acces-
sories
Proper Overcurrent Protection Provided
Proper Chilled Water Line Size to Unit
Proper Hot Water Line to Unit
All Services to Unit in Code Compliance
All Shipping Screws & Braces Removed
3. COOLING/HEATING CONNECTIONS
Protect Valve Package Components From
Heat
Connect Field Piping to Unit
Install Drip Pan as Required
Install Condensate Pan Under Piping as
Required
Mount, Secure, and Support Valve Packages
Pressure Test All Piping for Leaks
Insulate All Piping as Required
Connect Supply and Return Pipe to Correct
Coil Connections
4. DUCTWORK CONNECTIONS
Install Ductwork, Fittings & Grilles as Required
Proper Supply/Return Grille Types & Sizes
Used
Insulate All Ductwork as Required
5. ELECTRICAL CONNECTIONS
Refer to Unit Wiring Diagram
All Field Wiring in Code Compliance
Connect Incoming Power Service or Services
SCR Fan Speed Control Wired to Low Speed
Tighten All Electrical Connections Prior To
Start-Up
6. UNIT STARTUP
General Visual Unit & System Inspection
Record Ambient Temperature
Close All Unit Isolation Valves
All Ductwork & Grilles in Place
Start Fans, Etc.
Check All Ductwork & Units for Air Leaks
Record All Final Settings for Future Use
Check All Dampers for Proper Operation
Verify Proper Heating Operation
Verify Proper Cooling Operation
Record Electrical Supply Voltage
Check All Wiring for Secure Connections
Vent Water Systems as Required
All Unit Panels & Filters In Place
Check for Overload Condition of All Units
Balance Air Systems as Required
Check Piping & Ductwork for Vibration
Verify Proper Cooling Operation
Reinstall All Covers & Access Panels